Roundhouse Renewable Energy Project

As proposed by:

CRC Development, LLC
2602 McKinney Avenue, Suite 200
Dallas, TX  75204
214.880.3400


Catalyst Renewables has submitted a Site Plan Application and Full Environmental Assessment Form (EAF) to the City of Oneonta Planning Commission for consideration of a proposed renewable energy facility utilizing regionally grown biomass.  Catalyst Renewable's Roundhouse Renewable Energy Project is a thirty-five (35) megawatt advanced technology renewable electrical-power generation facility designed with New York State's regional economic and environmental future in mind.  This project is proposed to transform an unused Brownfield site in the City of Oneonta into a modern renewable energy production facility.

The project is a renewable energy power project, generating electricity from regionally-available biomass. Located on undeveloped former railroad maintenance property in the City of Oneonta, Otsego County, the project will include a stoker-fired boiler system with advanced emission controls, including an advanced nitrogen oxide (NOx) and carbon monoxide (CO) reduction system, high-efficiency electrostatic precipitator, advanced water treatment system with waste water recycling.

The proposed facility will consist of the following major components: a stoker boiler, a steam turbine generator, a cooling tower and an electrical switchyard. The facility will create a nominal 31 net megawatts (MW) of electrical energy. Its fuel yard will include a truck scale and two truck dumpers, a fuel stacker, two automated reclaimers and feed belts. An existing electrical interconnect, upgraded, will transmit power to a distribution substation located on River St. Service.

The facility will operate in a condensing steam cycle. Biomass material (wood components) will be fired in the boiler and heat from the gases will be transferred to the water/steam tubes inside the boiler. Water will be boiled to produce steam and then superheated for use in the steam turbine. The facility will be constructed with an extraction steam turbine, enabling the facility to sell steam ("cogeneration") to nearby users if it is economic to do so.

The site is located on ~60-acre parcel; the proposed facility and associated wood yard will occupy approximately 15 acres within the proposed site, with the powerhouse building and appurtenant structures occupying 3 acres and the fuel yard, fuel-receiving area, road and parking areas occupying 12 acres. Property use abutting the site is predominantly medium-density industrial and commercial.

The City of Oneonta Planning Commission has been preliminarily designated as the Lead Agency that will undertake the SEQR Review for the project.  All comments and questions related to the site plan and/or Long EAF may be submitted to the commission via the City Clerk's Office, 258 Main Street, Oneonta, NY  13820.

SEQR Preliminary Estimate of Review Schedule
(as developed by Stearns and Wheler for City of Oneonta Planning Commission)

Estimated SEQR Schedule


The Site Plan Application and Long Environmental Assessment Form are provided below in their entirety as submitted by Catalyst Renewables:
 

Site Plan Application

Site Plan Application Cover Page

Part I:  Site Plans and Elevation Plans

Conceptual General Arrangement Project Layout
Project Site Plan
Combustion System - Conceptual General Arrangement
Combustion System -  Section B - Thru Combustion System
Combustion System - Combustion System Plans and Section
Boiler House - Conceptual General Arrangement - Section C - Thru Boiler Building

Part II:  Grading, Erosion, and Sedimentation Control Plans

Sedimentation Erosion Plan
Structural Measures for Erosion and Sediment Control - NYSDOT
Miscellaneous Standards and Specifications - NYSDEC

Part III:  Project Construction Schedule

Proposed Development and Construction Schedule
 

Long Environmental Assessment Form (EAF)

EAF Cover Page

Full Long Form EAF:

EAF Appendix A - Long Form

EAF Attachment A:  Supplemental and Additional Information

EAF Attachment A

EAF Attachment B:  Forest Management Plan (draft)

EAF Forest Management Plan

Attachment C:  Visual Representation

EAF Visual Representations

Attachment D:  RSCR Information

Regenerative Selective Catalytic Reduction
Regenerative Selective Catalytic Reduction - NOx Control System
 

Formal Presentation to Planning Commission

Catalyst Renewables made its formal presentation to the City of Oneonta Planning Commission at its regular meeting of July 19, 2006.  The materials handed out and presented at the meeting are provided below:

Presentation Handout - As prepared and distributed by Catalyst

Correspondence Summaries (as prepared by City Clerk):

Pre-application Submissions (items received prior to June 2006)
Post-application Submissions (items submitted after June 2006)

Public Meeting for Biomass Proposal

Catalyst Renewables will be holding a public information session on the biomass proposal on Wednesday, August 2, 2006 from 7-9 PM.  The session will be held at the Hunt Union Ballroom on the SUNY College at Oneonta campus.  Advertisements for this meeting will be in the July 27th and August 1st editions of The Daily Star.

Planning Commission Meeting - August 16, 2006

At its regular meeting of August 16, 2006, the City of Oneonta Planning Commission issued a Positive Declaration with a directive to conduct a Public Scoping Session in regard to the Roundhouse Renewable Energy Project as proposed by CRC Development Corporation (CRC).

List of Permits Required as Per Stearns and Wheler

Sterns and Wheler have prepared a list of potential permits for the Roundhouse Renewable Energy Project.  There are approximately 14 possible permits that may need to be issued/approved.

Discontinuance of SEQRA Process

Catalyst Renewables has notified the City of Oneonta that it has suspended the SEQRA process for the biomass proposal resulting from Mayor Nader's September 15th letter to Catalyst.

Mayor Nader's Letter to Catalyst - September 15, 2006
Catalyst Response to Mayor's Letter - September 19, 2006

 

 